RWE Essen, MHKW Karnap Linie 3 AdvanceTEC LLC/ Wacker North America
| Project description: | Engineering, construction and manufacture of a steam and gas preheater.2. Casing from carbon steel with TFM film covering. Heat exchanger bundle with PFA-coated carbon steel pipes | |
| Client: | RWE Essen, Karnap waste-to-energy plant line 3 | |
| Technical data: | Clean gas volume 168000 Nm³/h Heating from 87°C to 140°C | |
| Receipt of order: | 07/2012 | |
| Status: | Start of manufacture | |
| Project description: | Design, engineering, construction, manufacture, installation supervision and commissioning of two exhaust air scrubbers for the physical and chemical analysis of the polysilicon works in Charleston, Tennessee, USA. | |
| Client: | AdvanceTEC LLC/ Wacker North America | |
| Technical data: | physical-analysis scrubber: 10,000 m³/h chemical-analysis scrubber: 20,000 m³/h Separation of acidic flue gas components such as HCl, HF, NOx and trichlorsilane | |
| Receipt of order: | 08/2012 | |
| Status: | Detail engineering | |