Engineering, construction and fabrication
| Bandirma Gübre Fabrikalan A.S. (BAGFAS) | ||
| Project description: | ThyssenKrupp Uhde from Dortmund is supplying the Turkish company BAGFAS with a plant for the manufacture of calcium ammonium nitrate fertiliser. As part of this, WIG was awarded the contract for the engineering, design, construction and delivery of a NH³ evaporator for air dehumidification with downstream droplet separator and subsequent re-heating by means of a steam air pre-heater (Air Conditioning Unit). | |
| Client: | ThyssenKrupp Uhde, Dortmund | |
| Technical data: | Air Conditioning Unit | |
| Receipt of order: | 04/2013 | |
| Status: | Detail engineering | |
| Bandirma Gübre Fabrikalan A.S. (BAGFAS) | ||
| Project description: | ThyssenKrupp Uhde from Dortmund is supplying the Turkish company BAGFAS with a plant for the manufacture of calcium ammonium nitrate fertiliser. In this regard, WIG received a further order for engineering, construction, manufacturing and supply of steam-heated air pre-heaters: Drying Air Heater, Injection Air Heater and Air Heater. | |
| Technical data: | Drying Air Heater | |
| Technical data: | Injection Air Heater Airflow rate 15276 kg/h Heat from 29 °C to 85 °C, Thermal capacity 235 KW | |
| Technical data: | Air Heater Luftmenge 265000 kg/h Aufheizung -8 Grad C auf 10 Grad C, Wärmeleistung 1350 KW | |
| Receipt of order: | 05/2013 | |
| Status: | Detail engineering | |
| Tongmei Datang Tashan Power Generation Co., Ltd | ||
| Project description: | Engineering, design and manufacturing of flue gas coolers for two lines to recover heat for boiler feed water pre-heating The scope of supply includes 2x 6 pieces flue gas coolers including the system technology consisting of the engineering and supply of interconnecting piping, valves, pumps, the necessary structural steel and electrical and I&C engineering, as well as supervising installation and commissioning | |
| Client: | Tongmei Datang Tashan Power Generation Co., Ltd. | |
| Technical data: | Flue gas volume 3,446,368 kg/h Cooling from approx. 130 °C to 90 °C Extracted heat approx. 42 MW | |
| Receipt of order: | 06/2013 | |
| Status: | Basic engineering | |