Engineering, construction and fabrication
| BIOMASSE ITALIA S.p.A. Crotone | ||
| Project description: | Engineering, design and manufacturing of a flue gas cooler for a water pre-heater (economiser) consisting of 2 modules coated with fluoroplastic-coated steel pipes, casing made of carbon steel with TFM-foil lining. | |
| Technical data: | Flue gas volume 84,375 Nm³/h Inlet/outlet temperature 161/132 degrees C Water volume 55.50 m³/h Inlet/outlet temperature 90/107 degrees C Thermal capacity 970 KW | |
| Client: | BIOMASSE ITALIA S.P.A. | |
| Receipt of order: | 11/2013 | |
| Status: | Detail engineering | |
| WtE plant Bielefeld Replacement of primary air pre-heater VL3 | ||
| Project description: | Engineering, design, manufacture, supply, installation and commissioning of the primary air pre-heater for incineration line 3, consisting of 2 modules with stainless steel pipes, casing with bypass, including the air-side flaps. | |
| Technical data: | Air flow 45,600 Nm³/h Inlet/outlet temperature 8 / approx. 124 °C Steam 3.8 bar Inlet/outlet temperature 144 degrees C Steam consumption about 3200 kg/h Thermal output approx. 1900 KW | |
| Client: | MVA Bielefeld | |
| Receipt of order: | 12/2013 | |
| Status: | Detail engineering |