
The WIG has been awarded yet another follow-up contract for a biomass power plant located in Southern Italy. 2 x 2 modules with enameled pipes are to be integrated into the existing flue gas duct and operated at flue gas temperatures of up to 200 °C...
...The modules are completely coated with corrosion-resistant fluoropolymer film. They will substitute metallic devices which had to be replaced due to corrosion. The delivery was took place in March 2017.
If you would like to know more about this, please contact Mr. Jochen Meinhof at +49 2361 1047-15 or send an email to j.meinhof@wallstein.de.